SlipstreamJobs tracks this role from the company's public career site. Apply directly on the employer's site.
Salary: USD 128,400 - 192,600 / annual
Relativity Space is building Terran R, a next-generation reusable rocket designed to deliver customer payloads to orbit. The Manufacturing team owns all process development, fabrication strategy, and production equipment for this vehicle, working cross-functionally to translate engineering requirements into highly optimized production lines.
As Supervisor of Integration Subassemblies on the First Shift (5:00 AM – 3:30 PM PST), you will directly lead up to 25 direct reports, including technicians and shift leads. Your responsibilities include:
• Scheduling and prioritizing work while enforcing attendance, safety, and quality standards across the production floor
• Serving as second-line technical support, driving root cause resolution and coordinating with cross-functional partners
• Managing team performance, career development, and advancement opportunities through 1:1s, performance reviews, and corrective actions
• Leveraging relevant data to communicate team progress to leadership and reinforce a high-performance, professional, and accountable culture
• Overseeing equipment, tooling, and 6S compliance across the work center
• Supporting complex assembly operations in a high-pace environment
You will work within a manufacturing organization that is deep in process development for a reusable rocket, with responsibilities spanning factory floor layout, complex tooling development, and interfacing with vehicle engineering to influence rocket design. This is an opportunity to shape production processes and culture at a critical stage of the company's growth.
**Requirements:**
• 2+ years of leadership, lead, or supervisory experience overseeing production technicians/operators
• Experience managing large teams and supporting complex assemblies in a high-pace environment
• Comfortable enforcing policies, corrective actions, and performance management
• Experience developing work cells and creating floor layouts based on capacity planning
• Background in integration builds, pneumatic/hydrostatic testing of components, and clean line processes