SlipstreamJobs tracks this role from the company's public career site. Apply directly on the employer's site.
Form Energy is hiring a Senior Oracle PIM Operations Analyst to serve as the functional owner for Product Information Management (PIM) at their high-volume battery manufacturing facility in Weirton, WV. You will be the critical bridge between engineering design teams and the manufacturing floor, ensuring product data, revisions, and configurations are accurately translated from the PLM system into Oracle ERP.
Key responsibilities include:
- Serve as primary functional owner for Oracle PIM within the manufacturing facility, ensuring data integrity and system alignment
- Coordinate with PLM administrators to manage Engineering Change Orders (ECOs) and meticulously manage effectivity dates within Oracle
- Partner with New Product Introduction (NPI) teams to determine optimal timing for making new design changes effective on the production floor
- Own and execute the process for cutting in new parts and revisions on active production lines with minimal disruption
- Maintain and update highly accurate work order configuration documents to reflect current manufacturing bills of material (mBOMs)
- Proactively analyze, troubleshoot, and resolve variances between PLM effective revisions and Oracle effective revisions to prevent build errors
Required qualifications:
- Bachelor's degree in Supply Chain, Engineering, Information Systems, Business, or related field
- 5+ years of experience in manufacturing operations, master data management, or NPI
- Deep hands-on expertise in Oracle PIM and PLM systems (e.g., Agile, Teamcenter, Arena)
- Strong understanding of manufacturing Bills of Material (mBOMs), routing, ECO processes, and ERP/PLM data architecture
- Demonstrated ability to coordinate complex changes across Engineering, Supply Chain, and Production teams
- High attention to detail with proven experience identifying and resolving complex data variances between enterprise systems
Form Energy manufactures long-duration iron-air battery systems for grid-scale energy storage. The Weirton facility is a 550,000-square-foot hub for high-volume battery production. Relocation assistance is available.